Our references

The strength of PARLYM INTERNATIONAL is its capacity to offer "turn-key" and customized solutions.

Due to the geographical location of our local branches, we have a perfect knowledge of the territories in which we operate and very close proximity to our customers.

A genuine partner in your projects, we can provide investment solutions:

  • Investment partner
  • Technical-economic studies
  • Completion of investment profitability studies
  • Technical and strategic audits

Today, our completed industrial projects are visible in more than 30 countries and appreciated by more than 70 partner-clients.

Search a reference

Simply type in a keyword or active the search filters in order to refine the display of our references.



Ivory Coast
SEA INVEST
2010

 


Civil works on the VRIDI logistics base

Numéro d'affaire : P090029
Montant : 920 K€

Securing the site fence, installation work of the defenses mooring wharf, work rehabilitation medians asphalt, concrete rework the existing wharf and the installation work of bollards.

       
Ivory Coast
SEA INVEST
2010

 


Design and supervision for the construction project of the UREE storage warehouse

Numéro d'affaire : P090030
Montant : 860 K€

The increase of the storage surface was completed by building an extension on to the existing “Acajou” storage warehouse. This extension of about 3100 m3 was completed for the storage of oxidizing materials in bulk or in bags.

       
Ivory Coast
SEA INVEST
2010

 


Completion of a maintenance warehouse and supply of maintenance equipment

Numéro d'affaire : P090024
Montant : 1 027 K€

Construction of a maintenance warehouse used for the general maintenance of the logistical base and particularly for the maintenance of material-handling vehicles.

       
Ivory Coast
SEA INVEST
2010

 


Design and supervision of the construction of a steel structure warehouse connecting two existing warehouses

Numéro d'affaire : P090028
Montant : 67 K€

       
Ivory Coast
SEA INVEST
2010

 


Design and supervision of the ABINADER warehouse

Numéro d'affaire : SN10
Montant : 310 K€

Renovation of the framework and roofing, renovation of the civil engineering and warehouse floor surface, replacement of the adjoining wall, renovation of the warehouse’s electricity and lighting, repairing of the interior and exterior paint, and renovation of the warehouse manager’s office.

       
Cameroon
SCDP
2010

 


Supply of piping, fitting equipment and valves for the reassignment works of the tanks of the SCDP storages in MBOPPI, BESSENGUE and BAFOUSSAM

Numéro d'affaire : E 6686
Montant : 145 K€

Supply of piping, fitting equipment and valves for the reassignment works of the tanks of the SCDP storages in MBOPPI, BESSENGUE and BAFOUSSAM

Nigeria
TOTAL E&P
2010

 


Supply for OFON-2 exploration platform

Numéro d'affaire : E 7714
Montant : 5 104 K€

Supply of X42 and X65 tubes with neoprene fire proof coating, bends, flanges and accessories for the Jacket, topsides and risers designed for the construction of an exploration platform in Korea (HHI) then towed to the OFON exploration field in Nigeria.

   
Togo
COMPEL
2010

 


Supply of piping equipment

Numéro d'affaire : E 6476
Montant : 111 K€

Description of the project :  Supply of piping equipment

Mauritania
MEPP
2010

 


Rehabilitation studies for MEPP storage unit at Nouakchott

Numéro d'affaire : E 4114
Montant : 135 K€

Technical and economic study for the rehabilitation of MEPP storage unit at Nouakchott
Technical studies for the rehabilitation of the onshore and offshore facilities and to put back into service the storage unit
Regulatory studies, hazard studies and assistance in the preparation of internal operating plan
Financial studies taking into account the turnover, the price breakdown, the profitability of investments considered

Mali
LIBYA OIL
2010

 


Technical and economic study of an LPG storage and bottling plant

Numéro d'affaire : E 6457
Montant : 152 K€

Economic Survey and profitability analysis.

Plant design, preliminary design, process study including the technical documents (drawings, diagrams, calculation note), work and equipment specifications, budget and implementation schedule.

France
EDF
2010

 


Inspection of fuel oil tanks

Montant : 80 K€

Inspection of empty and full fuel oil tanks, ultrasonic measurement of their thickness, testing of the welds using dye penetrant methods and magnetoscopy, testing of the verticality and roundness by lasergrammetry, and determination of the materials' composition.

       
Ivory Coast
GESTOCI
2009

 


Construction of three 30 000 m3 storage tanks and three 4 km pipelines connecting the VRIDI Gestoci storage to the oil wharves of the VRIDI Canal

Numéro d'affaire : E 4860
Montant : 404 K€

Project management (design and supervision), APS, APD, works contract assistance, supervision and acceptance of civil works for the GESTOCI Mer / Mer project

       
Ivory Coast
PETROCI
2009

 


Feed and detailed studies to upgrade storage capacities of GESTOCI YAMOUSSOUKRO fuel tank farm.

Numéro d'affaire : E 5511 / 6945
Montant : 1 196 K€

Extension of the fuel storage capacity of 30 000 m3 to 60 000m3

Engineering studies:

-FEED study
-Detailed study
-Detailed studies for civil works, piping, electricity, steel structure, steel works, etc.
Download attachment document

       
Ivory Coast
PETROCI
2009

 


Study of the displacement of two high voltage power lines on the Vridi Canal site to allow for the future implementation of the La Paix refinery

Numéro d'affaire : E 5568
Montant : 439 K€

Study of the displacement of two high voltage power lines on the Vridi Canal site to allow for the future implementation of the La Paix refinery

       
Congo
SC LOG
2009

 


Studies, supply, installation and commissioning of level alarms for the hydrocarbon tanks

Numéro d'affaire : E 5699
Montant : 390 K€

Designs, supply, installation and commissioning of high and very-high level detection probes in the vertical aerial hydrocarbon storage tanks of the storages in the port of Pointe-Noire and at MPILA Brazzaville