Our references

The strength of PARLYM INTERNATIONAL is its capacity to offer "turn-key" and customized solutions.

Due to the geographical location of our local branches, we have a perfect knowledge of the territories in which we operate and very close proximity to our customers.

A genuine partner in your projects, we can provide investment solutions:

  • Investment partner
  • Technical-economic studies
  • Completion of investment profitability studies
  • Technical and strategic audits

Today, our completed industrial projects are visible in more than 30 countries and appreciated by more than 70 partner-clients.

Search a reference

Simply type in a keyword or active the search filters in order to refine the display of our references.



Mali
SGDS
2004

 


Completion of a 14 500 m3 diesel, gasoline and oil storage, supply by truck and railroad

Numéro d'affaire : E 344 / 834 / ATE
Montant : 1 750 K€

Construction design, procurement and civil works supervision

       
Morocco
SAMIR
2004

 


Appeal for expressions of interest for SAMIR to obtain the concession and distribution facilities hydrocarbons PORT TANGER

Numéro d'affaire : C02-029
Montant : 100 K€

Assistance in the preparation of an EOI for the construction of an oil storage for the bunkering of ships at the dock or offshore and economic and technical studies

Mali
SHELL
2004

 


Supply of equipment and materials for a mine storage unit

Numéro d'affaire : E 2044
Montant : 136 K€

Materials comprising

- loading pumps
- unloading pumps
- firefighting diesel motor pump
- Hoses
- Meters
- Pump Meters

Equatorial Guinea
EXXON MOBIL
2003

 


Feasibility study for a hydrocarbon storage on the island of BIOKO

Numéro d'affaire : SN2
Montant : 80 K€

Dimensioning, implantation and economic study for a complete 20 000 m3 diesel storage. Implantation and sizing of a pipeline (1 km). Design of a PDMS model and a commented movie presenting the storage.

   
Ivory Coast
PETROCI
2003

 


Rehabilitation and upgrading of the rack lines and oil wharves of PETROCI Holding in the VRIDI Industrial Zone for the Big Wharf (Grand Appontement) project

Numéro d'affaire : COO-061
Montant : 115 K€

Technical designs of the installations: Audit and rehabilitation of the land and underwater installations, rehabilitation and upgrading of the installations, creation of two new bunkering lines.

Economic studies : Investment budgets, operating costs, establishment of the flow rates and operating accounts of the facilities

       
Ivory Coast
SMB
2003

 


Transformation of ex-Sodesucre’s molasses storage facilities into SMB/SIR’s asphalt storage

Numéro d'affaire : SN11
Montant : 4 700 K€

Revamping and transformation of 2 molasses storage tanks into asphalt storage connection to the Vridi depot.

Construction of an asphalt storage unit (2x7500 m3) and rack to the wharf of the Vridi canal: Administrative building – guard post – boiler room, piping and pump system, truck loading station with scale, fire-fighting system with a motor pump unit on the canal

       
Congo
GNCAC
2003

 


Studies and procurement for the construction of a crude oil treatment, storage and shipping facility

Numéro d'affaire : E 1525 / 1741
Montant : 850 K€

Engineering, detailed design, procurement and shipping CIF to Pointe Noire

       
Nigeria
OCEAN ENERGY
2003

 


Study of a multiproduct fuel storage unit of 30,000 m3 capacity

Numéro d'affaire : E 3615
Montant : 28 K€

- FEED studies for the construction of a multi-product storage extendable to 60,000 m3 and implementation in Port Harcourt free zone

- Connection of the storage to oil wharf by a (2x 10 inch) Pipeline

   
Djibouti
CORRAL HOLDING
2002

 


Complete engineering design of a liquefied gas storage

Numéro d'affaire : SN6
Montant : 230 K€

Engineering and Feasibility Designs: LPG storage tank and road tanker loading/unloading station.

Ghana
ELF
2002

 


Audit of the installations of the TAKORADI storage and renovation of the pipeline supplying the assessment storage.

Numéro d'affaire : SN3
Montant : 80 K€

Audit of the installations of the TAKORADI storage and renovation of the pipeline supplying the         assessment storage.

       
Madagascar
JOVENNA
2002

 


Completion of two preliminary projects for hydrocarbon storage

Numéro d'affaire : E 1296
Montant : 140 K€

MAJUNGA: Selection of the appropriate site, preliminary design, detailed design and construction request for quotation file.

TAMATAVE: Audit of the existing oil factory, brief preliminary design study, request for quotation file for the demolition of the warehouses and stores, detailed design study, and request for construction quotation file.

Togo
STSL / SHELL
2002

 


Supplies, installation and commissioning of a 500 m3/h at 150 m fire-fighting motor pump unit

Numéro d'affaire : E 1122
Montant : 120 K€

Supplies, installations and commissionning

       
Morocco
SAMIR
2002

 


Completion of a storage plant for the SAMIR for merchandising of CASABLANCA AREA

Numéro d'affaire : C02-022
Montant : 150 K€

Technical-economic feasibility study for a storage south of Casablanca

Burkina Faso
MOBIL
2001

 


Design of a 4000 m3 jet A1 oil storage at the Ouagadougou airport

Numéro d'affaire : E 675
Montant : 53 K€

-Preliminary design
-Implantation studies
-Equipments
Ethiopia
CORRAL HOLDING
2001

 


Complete engineering design of a LPG storage in ADDIS ABEDA

Numéro d'affaire : SN5
Montant : 165 K€

Engineering and Feasibility Designs: LPG storage tank, road tanker unloading and bottling plant


<<   7 8 9 10 11 12 13 14 15   >>