Our references

The strength of PARLYM INTERNATIONAL is its capacity to offer "turn-key" and customized solutions.
Due to the geographical location of our local branches, we have a perfect knowledge of the territories in which we operate and very close proximity to our customers.
A genuine partner in your projects, we can provide investment solutions:
- Investment partner
- Technical-economic studies
- Completion of investment profitability studies
- Technical and strategic audits
Today, our completed industrial projects are visible in more than 30 countries and appreciated by more than 70 partner-clients.
Search a reference
Simply type in a keyword or active the search filters in order to refine the display of our references.

Shock absorber BK
PARLYM participates in the devices designed study to limit the consequences of the fall of the used fuel transport chute during handling (+0/+20m). These devices consist of an energy absorber (DAE 50t) handled by a motorized rail/road trolley and a set of elements (DASHPOT) for the handling of the castle in loading pit.



Rehabilitation of the power plant fire system
Rehabilitation of the fire network of the EDF power station of Vazzio (South Corsica). The Vazzio plant, close to Ajaccio, is one of the oldest EDF installations on Corsica. it has a power of 132.3 MW (Diesel).



ASG-u connection
Design studies at the level of Front End Engineering Design (FEED) of the ASG-u connections. This study concerns the mechanical studies of the new ASG-u pipes in existing buildings and the connection on the ASG of the CPO-BUGEY bearing.


Diesel Ultimate Rescue
Administration of the 3D digital model of the DUR building with PDMS. This additional power supply will be able by 2018 to provide on each NPGS (Nuclear Power Generation Site) sufficient electricity to maintain a stop unit in case of loss of other external and internal power supplies.


Cell Gap Fact Sheets
PARLYM supports EDF in the processing of the declaration of difference report, which is the result of a deviation associated with a modification to be integrated on site. PARLYM studies the solutions proposed by the manufacturers and carries out the technical studies to propose a solution adapted to the problem according ti the impacted business : mechanical, GC, electricity, order control, test...



Updating Technical Databases
Management and updating of the technical databases following the modifications of the basic systems of the nuclear power plant in operation : nomenclatures materials EAM, mechanical schematics, basis of surveys photographs and plans of tracks, safety report, extraction of technical data.



SEISMIC INSPECTIONS ACCORDING TO SQUG METHOD
As part of the Post Fukushima Project, PARLYM accompanies EDF on the seismic inspections of the pipeline lines of several Nuclear Power Generation Site (NPGS) identified as part of the hard core. The objective is to verify the robustness of these lines to the SND earthquake acording to the SQUG (Seismic Qualification Utility Group) method.



Plateau Search Documentary
Research to the trades in the field of Management Documentary of the demands in real-time, or strategic business of the nuclear fleet in operation, for different internal and external interlocutors EDF to the DIPDE.



Processing of conformity deviations
Processing CAADS requests ICPY1042 and ICPY1405. These deviations in conformity concern the anchorages of the TEF 101-102-103 BA tarpaulins and anchorages of the interchange brackets REN 051-052-053-054 RF. The service consists in studying reinforcing solutions that are robust to the different mechanical stresses of the materials described.



Synthesis and Planning Unit Piping / HVAC / ITER TB04
Piping development studies / HVAC of lot TB04 of the ITER project. ITER is a nuclear research reactor at Nuclear Fusion, Tokamak type.




Plateau Supplier Document Review (SDR) DUS Projet
As part of the DUS (ultimate back-up diesel) project, PARLYM supports WESTINGHOUSE in the verification of operational documents : receipt of manufacturer's documents and technical verifications taking into account the end-customer's requirements (EDF DIPDE). The DUS installations will ultimately be able to provide sufficient electricity on each Nuclear Power Generation Site (NPGS) to keep an outstanding part (earthquake, tornado, flood, etc.) out of control.



GB101B Compressor
As part of regulatory upgrade on SO2, NOx, CO atmospheric emissions, has commissioned a new volumetric compressor GB101B to be installed, integrating the revamping of the existing installations (existing compressor, addition of new equipment type filter, pumps, exchangers and connections process piping and utility).



DUS TTS CATTENOM 3 Site Monitoring
PARLYM participates at the "site monitoring" function. This building will ultimately be able to supply on each NPGS (Nuclear Power Generation Site), sufficient electricity to keep a suffering part (earthquake, tornado, flood, etc) out of control.


Rouen Petit Couronne Depot, Reconditioning storage
As part of the 31 petroleum storage tanks reconditioning at Petit Couronne, connecting lines for the loading unloading systems and the wharf on the banks of the Seine, BOLLORE has entrusted the project management to PARLYM. The project includes the phases of FEED (Front End Engineering design) / BE (Basic Engineering) studies, consultation and assistance to the works contracts, direction and works supervision until final receiving.



Martigues Not Lodged Cell
As part of a master contract with the engineering department of TECHNIP Région Sud, PARLYM brings its technical expertise to major projects. The areas covered by this contract are pipping, boiler making, civil engineering, structure and EIA (electronic automation instrument), in design as well as dimension or flexibility calculations.